The demolition of a house is an expensive project and will often require the services of a professional. The total cost will depend on the size, location, materials, access, asbestos and other factors.

Generally speaking, the demolition process takes between one to two months from start to finish. There are many aspects that contribute to this time frame, including pre-work and permitting.

Demolition costs will also vary depending on whether the property is attached to another home or is located on a large block. This can increase the amount of work that needs to be done, as a large building will require more machinery and manpower.

Construction materials and site accessibility are the main factors affecting the cost of demolishing a property. The more difficult the site is to reach, the higher the demolition costs will be.

The cost of demolition can also be affected by the location of the property, as houses in busy areas will often have extra charges and be pricier to demolish. This is due to vehicular access for waste disposal lorries, skip hire permits and emissions charges.

If the property contains asbestos, the discovery of this hazardous material will likely increase the cost of your demolition job by up to three times. This is because it must be dealt with by a specialist, using specialised equipment and safety measures.

In addition, demolition with asbestos requires a permit from the Environmental Protection Agency (EPA). This is why if you are dealing with asbestos, it will be necessary to take additional precautions and ensure that the work is conducted by a qualified contractor.

Other costs that may be involved with the demolition of a property include labour, the removal of rubbish and the disconnection of utilities such as electricity, water and sewerage. These costs will all need to be accounted for in the final price of your demolition project.

Moreover, it will be important to factor in the time and distance it will take for waste to be transported from your site to a recycling or landfill facility. This can add up to a significant amount of money in the long run, especially if your property is located on a large block.

It is also important to consider the type of materials that are being demolished and whether or not they will be recycled or re-used. This can reduce the total cost of demolition by reducing the amount of debris that is left on the property after it is demolished.